Smart Metering Supply, Installation & Connectivity Services

A Contract Award Notice
by UNITED UTILITIES WATER LIMITED

Source
Find a Tender
Type
Framework (Services)
Duration
not specified
Value
___
Sector
INDUSTRIAL
Published
17 Jan 2025
Delivery
not specified
Deadline
n/a

Concepts

Location

North West England:

Geochart for 1 buyers and 1 suppliers
United Utilities Water
Arqiva
Leaflet | Map tiles by Stamen Design, under CC BY 3.0. Data by OpenStreetMap, under ODbL.

1 buyer

1 supplier

Description

United Utilities (UU) have committed to the rollout of more than 900,000 Smart AMI meters during AMP 8 as a key enabler to reduce water supply volumes (via reductions in per capita consumption (“PCC”), reductions in customer-side leakage (“CSL”) and non-house hold (“NHH”) demand). In order to achieve this UU intend to appoint a single prime contractor to deliver the full scope of services (Smart Meter supply, meter installation and connectivity services/comms), whether directly or through sub-contract arrangements, for the 5 year AMP 8 period, with extension options up to the end of AMP 9.

Total Quantity or Scope

United Utilities (UU) have committed to the rollout of more than 900,000 Smart AMI meters during AMP 8 as a key enabler to reduce water supply volumes (via reductions in per capita consumption (“PCC”), reductions in customer-side leakage (“CSL”) and non-household (“NHH”) demand). In order to achieve this UU intend to appoint a single prime contractor to deliver the full scope of services (Smart Meter supply, meter installation and connectivity services/comms), whether directly or through sub-contract arrangements, for the 5 year AMP 8 period, with extension options up to the end of AMP 9. UU's strategy to implement and manage it's Smart Meter estate is to appoint a single supplier to acquire, deploy, commission, network and maintain the Smart Meter estate. This is being done to provide the necessary feed of data to allow the Company and their customers, to make decisions and change behaviours based upon the consist feed of consumption data. The appointed supplier will be responsible for: (i) Supply of Water Meters, (ii) Communications Unit (if water meter is not an integrated smart meter) (iii) Meter Installation (iv) Communications Network (v) Data management system and; (vi) Meter warranty

Award Detail

1 Arqiva (Hampshire)
  • Smart Metering Supply, Installation & Connectivity Services
  • Reference: 001791-2025-1-1

Renewal Options

Initial term of 5 years with the option to extend for up to an additional 5 years in 12 month increments.

Award Criteria

Technical 60%
price 40%

CPV Codes

  • 50411100 - Repair and maintenance services of water meters
  • 32412100 - Telecommunications network
  • 32430000 - Wide area network
  • 38421100 - Water meters

Indicators

  • Options are available.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains